A land engulfed in mystery, inhabited by vibrant people zealously guarding their culture – dancers, warriors, head-hunters; mountains, valleys, forests – all these form the portrait of Nagaland the moment the word is uttered.

Latest Posts
Top
Image Alt

The Doyang Hydro Project

The Doyang Hydro Project is a significant hydroelectric power project located in the Wokha District of Nagaland. It is owned by the National Thermal Power Corporation (NTPC) and the North Eastern Electric Power Corporation

The Doyang Hydro Project

per person
5 Days 4 Nights

The Doyang Hydro Project is a significant hydroelectric power project located in the Wokha District of Nagaland.

It is owned by the National Thermal Power Corporation (NTPC) and the North Eastern Electric Power Corporation (NEEPCO). The project was commissioned in the year 2000 and has a total installed capacity of 75 MW, generated from three 25 MW turbines.

Situated on the River Doyang, which is a tributary of the River Brahmaputra, the project harnesses the hydropower potential of this river . With a catchment area of 2606 sq. km and a design head of 67 meters, the Doyang Hydro Project is a medium-head storage scheme .

The Doyang Hydro Project is not only an important source of electricity but also a popular tourist attraction in the region. Visitors are drawn to the pristine natural beauty that surrounds the project . The picturesque landscape and the scenic Doyang Lake nearby make it an appealing destination for tourists.

To reach the Doyang Hydro Project, travelers can visit the Wokha District, which is approximately 38 kilometers away from the project site . From there, local transportation options such as taxis or private vehicles can be hired to reach the project area.

Please note that visiting the Doyang Hydro Project is subject to regulations and permissions, and it is important to check the local guidelines before planning a visit.

We hope you have a wonderful experience exploring the Doyang Hydro Project and the natural beauty of the surrounding area during your visit to Nagaland!

Sources:

  1. Doyang Hydro Electric Project – Wikipedia
  2. DOYANG HYDRO POWER STATION | North Eastern Electric Power Corporation
  3. Doyang Hydro Project – Tourism Nagaland
0 Reviews

Tour Plan

1
TOUR PLAN : Here is a tour plan suggestion for visiting Doyang Hydro Project in Nagaland: Day 1: Arrival in Dimapur
  • Arrive at the Dimapur Airport or railway station, the nearest airport or railway station to the Doyang Hydro Project.
  • Transfer to your accommodation in nearby Wokha district and rest for the day.
Day 2: Visit Doyang Hydro Project
  • After breakfast, drive to the Doyang Hydro Project, which is approximately 38 km away from Wokha district.
  • Tour the hydroelectric power project and learn about the power generation process and project history.
  • Enjoy boating in the beautiful Doyang Lake and take in the scenic views of the surrounding hills and waterfalls.
Day 3: Explore the Wokha district
  • Spend the day exploring the Wokha district and its scenic natural beauty, which includes verdant forests, rivers, and hills.
  • Visit the Mount Tiyi hill and the Totsu Cliff for sweeping views of the Wokha district and its surroundings.
  • Explore the local villages and interact with the friendly and welcoming locals to learn more about their culture and traditions.
Day 4: Visit the Longsa village
  • After breakfast, visit the nearby Longsa village, which has a rich history and cultural significance.
  • Explore the Morungs, traditional male dormitories, and Akherüs, traditional kitchens, to learn about the local life and customs.
  • Participate in local festivals and cultural activities, and enjoy traditional music and dance performances.
Day 5: Departure
  • After breakfast, bid farewell to the beautiful Doyang Hydro Project and the Wokha district and transfer to the Dimapur Airport or railway station for your departure.
Please note that this tour plan is a general suggestion and can be customized according to your preferences and the duration of your visit. It is always recommended to check the weather conditions, local regulations, and permits before planning a visit to the Doyang Hydro Project in Nagaland. We hope you have a delightful time exploring the hydroelectric power project and the natural beauty of the surrounding area during your visit to Nagaland!
You don't have permission to register